BATIMENT GARE SUD 2

As an engineering consultancy, we specialize in the design and implementation of electrical projects.

Technical information

  • Categories
    BIM, CONSTRUCTION NEUVE, ENERGIE, MINERGIE, PARKING, HABITATION
  • Maître de l'ouvrage

    RENTIMMO DEVELOPMENT SA

  • Architectes

    ARR ARCHITECTES

  • Features
    SIA 416 volume
    2'850 m3
    Floor area
    874 m2
    Cost CFC 23
    347'871 Fr. TTC
    Total cost
    2'800'000 Fr. TTC
    Energy standard
    Minergie
  • Links
  • Étude des prestations
    PP31
    PP32
    PP33
    PP41
    PP51
    PP52
    PP53
  • Document